Define the required treatment before selecting a rinser. Compare the installed process, container handling and utility information with the conditions on your filling line.
- Which air, water or treatment circuits are installed?
- What container handling parts and utility data are included?
Choose container treatment before choosing a rinser
Describe the container material, format and treatment required by the process. Compare installed air, water or other documented circuits. The treatment brief should be agreed with the process team; the machine name alone cannot establish the required result.
Define the application
Record product, container material and size, closure, nominal speed, format range, utilities and available floor space.
Compare like with like
Separate the machine itself from optional conveyors, change parts, controls, manuals, guarding, inspection systems and spare parts.
Build the delivered cost
Include inspection, dismantling, packing, loading, transport, duties, installation, modifications, validation and production start-up.