A specialist marketplace by BottlingScoutBottlingScout.com ↗

BottlingScout knowledge

Buying checklist

air, water and sanitising treatment before filling · international bottling equipment

Independent checklists for inspection, comparison, relocation and commissioning. This guide is written for bottlers evaluating container preparation and should be adapted to the actual machine and production project.

01

Define the application

Record product, container material and size, closure, nominal speed, format range, utilities and available floor space.

For Used Rinsers, pay particular attention to air, water and sanitising treatment before filling.

02

Compare like with like

Separate the machine itself from optional conveyors, change parts, controls, manuals, guarding, inspection systems and spare parts.

For Used Rinsers, pay particular attention to air, water and sanitising treatment before filling.

03

Build the delivered cost

Include inspection, dismantling, packing, loading, transport, duties, installation, modifications, validation and production start-up.

For Used Rinsers, pay particular attention to air, water and sanitising treatment before filling.