Before buying a rinser, establish which water is supplied, which portion may be recovered and which streams the site must discharge. Ask the supplier to identify the equipment included for each. Agree with the plant’s quality and utility teams what reuse is permitted for that application.
Record the water balance over a witnessed run
Use the same production format and observation window for input, permitted reuse and discharge. Include stops and any water consumed during setup. Measure or document the condition of the relevant tanks, filters and connections.
| Stream or check | Trial record | Responsible party |
|---|---|---|
| Fresh water supplied | Flow or volume for the stated period | ___ |
| Recoverable and authorised for reuse | Volume and allowed destination | ___ |
| Discharge to site | Destination, quantity and timing | ___ |
| Rinser output | Good containers in the same window | ___ |
Define the treatment and utility requirements for the bottle
Discuss the rinser and water available
Send format, required output and the recovery or discharge limits at the site.