Dismantling and relocation

air, water and sanitising treatment before filling · international bottling equipment

Independent checklists for inspection, comparison, relocation and commissioning. This guide is written for bottlers evaluating container preparation and should be adapted to the actual machine and production project.

01

Plan before dismantling

Document layout, cable and pipe routes, reference points, software backups, alignment and the sequence needed for reassembly.

For Used Rinsers, pay particular attention to air, water and sanitising treatment before filling.

02

Protect every component

Define cleaning, preservation, labelling, packing, lifting points, transport frames and environmental protection for the journey.

For Used Rinsers, pay particular attention to air, water and sanitising treatment before filling.

03

Prepare the destination

Confirm utilities, foundations, access, safety compliance, integration, commissioning resources and acceptance criteria.

For Used Rinsers, pay particular attention to air, water and sanitising treatment before filling.